EDMI is one of the leading Smart Energy Solutions providers in the world.  With over 20 years’ experience of manufacturing smart meters and millions of EDMI smart meters installed worldwide, EDMI’s products have a proven track record.  All meters are Ofgem / MID Approved for tariff use.

EDMI meters are available with remote AMR capability via GPRS.

Items: 13 of 3, per page
Drop items here to shop
Product has been added to your cart
  • Drag and drop me to the cart Please call SHM Choose the product options first
    Coming soon...

    The EDMI Mk10A is an MID Approved Code 5 compatible 3-phase kWh tariff meter with a pulse output.  It has a GSM modem enabling registers and load profiles can be read remotely via GPRS. This model is a 100A per phase whole-current meter. An Optional AMR Service is available with this meter.

    • £280.50
  • Drag and drop me to the cart Please call SHM Choose the product options first
    Coming soon...

    The EDMI Mk10A is an MID Approved Code 5 compatible 3-phase kWh tariff meter with a pulse output.  It has a GSM modem enabling registers and load profiles can be read remotely via GPRS. This model is for use with 5A Current Transformers. An Optional AMR Service is available with this meter.

    • £297.50
  • Drag and drop me to the cart Please call SHM Choose the product options first
    Coming soon...
    The EDMI Mk7C is an MID Approved single-phase kWh tariff meter with a pulse output.  It has a GSM modem enabling registers and load profiles can be read remotely via GPRS. This model is a 100A whole-current meter. An Optional AMR Service is available with this meter.
    • £225.25
Schneider ElectricTyco ElectronicsABBKamstrupCarlo GavazziElsterCircutorDMMeteringEDMIIMEIskraemecoSmart ProcessSHM MeteringLovatoNorthern DesignLandis GyrSocomecHobut

NEW on the SHM shop – 96x96 or 72x72 meters can be bought with Plastic or Steel enclosures. Contact SHM if you need more than 1 meter in the panel.
All meters used for billing in the EU must be MID Approved. Find out what the Measuring Instruments Directive means to you.
SHM frequently find that CT are miswired when troubleshooting installations. This document might help you to install CT correctly.